Crews with Superior Sea Walls and Docks, dredge the Henry Marina on Monday, June 9, 2025 in Henry. The operation involves using an excavator on a flat barge while removing silt from the water and placing it into a smaller barge that is pushed to the shoreline by a small tug boat.
An additional excavator will move the silt onto a tandem truck and then moved off-site. The trucks are dumping the material on a city farm located north of town.
Once completed the Henry Yacht Club will begin installation of replacement docks. (Scott Anderson)